Flashing For Windows New Construction
Along the bottom then the sides then the top.
Flashing for windows new construction. These skip taped gaps act as weeps giving any moisture that. Apply more flashing tape at the top. Flashing tape photo 6 is a thick pliable waterproof tape that goes under or over nailing window flanges sill and top flashing and house wrap. The damage often hidden under the siding or within the wall cavities may not show up for several years.
Window flashing terms to know before you start. Frame the window frame the rough opening for the window in the desired section of the wall. In a remodeling job apply self adhesive flashing strips in this order. There are two key principles for effective flashing at windows and doors to allow water to drain down the face of the wall and away from the building.
When you install a window in new construction the building wrap overlaps the self adhesive flashing. But folding the top tab into the opening gives water a way in behind the window s top flange. How to install flashing with felt or building paper. Typically flashing a window is a two part process.
The second half of window flashing occurs once the window unit is secured and squared within the rough opening. Apply the head flashing similarly extending two inches past either side of the jamb flashing to complete the window flashing detail. Be sure that all studs are properly braced and supported if the rough opening will span multiple studs. Step by step flashing installation and trimming instructions step 1.
Prepare the rough opening with housewrap and pan flashing most builders make an x cut in the housewrap and staple the resulting tabs into the opening prior to installing the window. New construction installation in masonry construction for flush flange or wood brickmould windows a window or door is installed in concrete or masonry wall with wood buck. Water leakage from faulty window and door flashing is one of the leading trouble spots in new construction. Apply jamb flashing over the jamb nailing fin continuing over and beyond the sill flashing two inches below.
New construction skip tape the head i skip tape apply short pieces of tape with gaps in between the lower edge of the flap in place. It is then attached using frame screws or clips and sealed to the wood buck using the flush flange or brickmould. The first half of window flashing occurs when you or your builder preps the rough opening for the window s installation. Integrate flashing with the water resistive barrier wr e g house wrap.